next up previous
Next: Switches burst page Up: A Description of Previous: Dependence Graph Statistics

Scheduling Summary

The summary switch controls another useful part of the Polaris listing - the Scheduling Summary. When summary is set to 1, a list of routines and loops is made which shows how the loops are actually scheduled by the Polaris postpass. The summary looks like this:

Scheduling Summary:
---|
---|SUBROUTINE: INTERF0
---|
---|INTERF0_do1000_RED_INIT: parallel
---| INTERF0_do1000_RED_INIT_2: serial
---| INTERF0_do1000_RED_INIT_1: serial
---| INTERF0_do1000_RED_INIT_0: serial
---|
---|INTERF0_do1000: parallel
---| INTERF0_do1100: serial
---|  INTERF0: serial
---|  INTERF0: serial
---|  INTERF0: serial
---|  INTERF0_do1110: serial
---|  INTERF0_do1120: serial
---|  INTERF0_do1130: serial
---|  INTERF0_do1140: serial
---|  INTERF0_do1150: serial
---|  INTERF0_do1160: serial
---|  INTERF0_do1170: serial
---|
---|INTERF0_do1000_RED_SUM: serial
---| INTERF0_do1000_RED_SUM_2: serial
---| INTERF0_do1000_RED_SUM_1: serial
---| INTERF0_do1000_RED_SUM_0: serial
---|
---|INTERF0_do2000: parallel
---|



Jay Hoeflinger
Mon Apr 21 11:52:18 CDT 1997